HL100 Rock breaker nut giant hammers hydraulic breaker for excavator loader hydraulic hammer
| Place of Origin: | Guangdong, China |
|---|---|
| Brand Name: | HL |
| Model Number: | HL100 |
| Price | Negotiable |
|---|---|
| Order (MOQ) | 1 pcs |
| Payment | L/C, D/A, D/P, T/T, Western Union |
| Product Origin | China |
LEAVE A MESSAGE
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.
- DETAILS
- WAREHOUSE
- SHIPPING
| Marketing Type: | Hot Product 2022 | Warranty: | 1 Year |
|---|---|---|---|
| Condition: | New | Applicable Industries: | Construction Work |
| Weight: | 800 Kg | Suitable Excavator(ton): | 12~15 Ton |
| Core Components: | Mainbody | Brand: | HL |
| Payment: | T/T;;Western Union;D/P;D/A;T/T | Delivery: | 5-15 Days |
| Process: | Forging | Local Service Loion:: | None |
| Warranty Of Core Components: | 1 Years | After Warranty Service: | Video Technical Support, Online Support |
| After-sales Service Provided: | Video Technical Support, Online Support | Port: | Guangzhou Shenzhen Xiamen |
HL100 Rock breaker nut giant hammers hydraulic breaker for excavator loader hydraulic hammer
Hydraulic breakers have become an important tool for hydraulic excavators, and some people have installed hydraulic breakers on excavators, backhoe loaders or wheel loaders for crushing operations.
Instructions:
1) Read the operation manual of the hydraulic breaker carefully to prevent damage to the hydraulic breaker and excavator, and operate them effectively.
2) Before operation, check whether the bolts and connectors are loose, and whether there is leakage in the hydraulic pipeline.
3) Do not peck holes in hard rock with a hydraulic breaker.
4) Do not operate the breaker when the piston rod of the hydraulic cylinder is fully extended or fully retracted.
5) When the hydraulic hose vibrates violently, stop the operation of the breaker and check the pressure of the accumulator.
6) Prevent interference between the boom of the excavator and the drill bit of the breaker.
7) Except for the drill bit, do not immerse the breaker in water.
8) Do not use the breaker as a lifting appliance.
9) Do not operate the breaker on the crawler side of the excavator.
10) When the hydraulic breaker is installed and connected to the hydraulic excavator or other construction machinery, the working pressure and flow of the hydraulic system of the main machine must meet the technical parameter requirements of the hydraulic breaker. The "P" port of the hydraulic breaker is connected to the high-pressure oil circuit of the main machine. Connection, "A" port is connected with the oil return circuit of the main engine.
11) The optimum hydraulic oil temperature when the hydraulic breaker is working is 50-60 degrees, and the maximum temperature should not exceed 80 degrees. Otherwise, the load of the hydraulic breaker should be reduced.
12) The working medium used by the hydraulic breaker can usually be consistent with the oil used in the hydraulic system of the main engine. It is recommended to use YB-N46 or YB-N68 anti-wear hydraulic oil in general areas, and YC-N46 or YC-N68 low temperature hydraulic oil in cold areas. Hydraulic oil filtration accuracy is not less than 50micro;m.
13) New and repaired hydraulic breakers must be recharged with nitrogen when they are in use, with a pressure of 2.5, ±0.5MPa.
14) Calcium-based grease or complex calcium-based grease must be lubried between the shank of the drill rod and the guide sleeve of the cylinder body, and it must be refilled once per shift.
15) When the hydraulic breaker is working, the drill rod must be pressed on the rock first, and the breaker must be started after maintaining a certain pressure, and it is not allowed to start in the suspended state.
16) It is not allowed to use the hydraulic breaker as a crowbar to avoid breaking the drill rod.
17) The hydraulic breaker and fiber rod should be perpendicular to the working surface during use, and the principle of not generating radial force is the principle.
18) When the broken object has broken or started to crack, the impact of the breaker should be stopped immediately to avoid harmful "empty hitting".
19) If the hydraulic breaker is to be stopped for a long time, the nitrogen should be exhausted, the oil inlet and outlet should be sealed, and the cutting iron should be stored in the environment of high temperature and -20 degrees.
|
project
|
unit
|
HL100
|
|
total length
|
mm
|
1939
|
|
working weight
|
kg
|
800
|
|
ib
|
1688
|
|
|
work pressure
|
kgf/cm2
|
140-170
|
|
psi
|
1990-2419
|
|
|
oil quantity
|
l/min
|
80-120
|
|
gpm
|
21.1-31.7
|
|
|
Strike frequency
|
bpm
|
450-630
|
|
Drill rod diameter
|
mm
|
100
|
|
inch
|
3.93
|
|
|
Drill rod length
|
mm
|
1000
|
|
inch
|
39.31
|
|
|
Drill rod weight
|
kg
|
57
|
|
Tubing size
|
mm
|
19
|
|
inch
|
PF3/4''
|
|
|
Suitable for excavators
|
ton
|
12-15
|
|
m3
|
0.46-0.6
|
|
item
|
value
|
|
Marketing Type
|
Hot Product 2022
|
|
Place of Origin
|
China
|
|
Guangdong
|
|
|
HL
|
|
|
Warranty
|
1 Year
|
|
New
|
|
|
construction work
|
|
|
800kg
|
|
|
Suitable Excavator(ton)
|
12~15ton
|
|
Core Components
|
mainbody
|
|
Brand
|
HL
|
|
Payment
|
T/T;;Western Union;D/P;D/A;T/T
|
|
Delivery
|
5-15 Days
|
|
Process
|
forging
|
|
Local Service Loion:
|
None
|
|
Warranty of core components
|
1 years
|
|
After Warranty Service
|
Video technical support, Online support
|
|
After-sales Service Provided
|
Video technical support, Online support
|
Warehouse & Inventory
We maintain large ready stock of full series excavator undercarriage spare parts, including track rollers, top rollers, idlers, sprockets, track chains and track shoes. All goods are well classified and stored in dry warehouse to avoid rust and damage.
Most standard models can be shipped out within 1–3 working days once payment confirmed. We support mixed container orders with different excavator brands and models. For large bulk orders or customized requirements, please contact our sales team to check real-time stock and lead time before placing the order.
Strict pre-shipment inspection will be carried out for every batch to guarantee the quality matches your requirements.
Shipping & Packing
Shipping Options:
1. Express: DHL / FedEx / TNT for small samples, delivery in 3–7 working days.
2. Air freight: Suitable for medium urgent orders, transit time 7–12 working days.
3. Sea freight: LCL or FCL for large bulk orders, transit time 20–40 days depending on destination port.
Packing Standard:
Standard export plywood wooden cases or strong cartons, fixed and wrapped tightly to prevent collision and rust during long-distance transportation. Wooden packing meets international fumigation requirements.
Freight cost is calculated separately based on total weight, volume and delivery address. We can provide EXW, FOB, CIF and DDP trade terms as your request.