Home › Excavator Hydraulic Breaker › HL185 Durable Life Mining Spare Parts All Series Excavator Heavy Duty Concrete Rock Stone Hydraulic Hammer Breaker

HL185 Durable Life Mining Spare Parts All Series Excavator Heavy Duty Concrete Rock Stone Hydraulic Hammer Breaker

 
Place of Origin: Guangdong, China
Brand Name: HL
Model Number: HL185
Price Negotiable
Order (MOQ) 1 pcs
Payment L/C, D/A, D/P, T/T, Western Union
Product Origin China

LEAVE A MESSAGE

If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.

Subject : HL185 Durable Life Mining Spare Parts All Series Excavator Heavy Duty Concrete Rock Stone Hydraulic Hammer Breaker
  • DETAILS
  • WAREHOUSE
  • SHIPPING
Marketing Type: Hot Product 2022 Warranty: 1 Year
Condition: New Applicable Industries: Construction Work
Weight: 4590 Kg Suitable Excavator(ton): 36-45 Ton
Core Components: Mainbody Brand: HL
Payment: T/T;;Western Union;D/P;D/A;T/T Delivery: 5-15 Days
Process: Forging Local Service Loion:: None
Warranty Of Core Components: 1 Years After Warranty Service: Video Technical Support, Online Support
After-sales Service Provided: Video Technical Support, Online Support Port: Guangzhou Shenzhen Xiamen

HL185 Durable Life Mining Spare Parts All Series Excavator Heavy Duty Concrete Rock Stone Hydraulic Hammer Breaker

Operation precautions

During the work of the breaker, the operator should pay attention to the following points:

1) Stop work when the hose vibrates violently

The high-pressure and low-pressure hoses of the breaker should be checked for excessive vibration. If that is the case, there may be a malfunction and you should contact your local service immediately for repair service. The hose joints should be further checked for oil leakage. If there is oil leakage, the joints should be re-tightened. During the operation, it should be visually checked whether there is any allowance for the steel drill. If there is no allowance, it must be stuck in the lower body. The lower body should be removed to check whether the parts should be repaired or replaced.

2) Stop the operation (avoid excessive air strikes)

Hammering should be stopped as soon as the stone is broken. If the air strike is continued, the bolts will loosen or break, and even excavators and loaders will be adversely affected. When the breakdown force of the breaker is improper or the steel drill is used as a pry bar, the phenomenon of empty strike will occur. (The sound of the hammer will change when the breaker hits empty)

3) The breaker cannot be used to move rocks

Do not roll or push stones with a steel drill or side of the stand. Because at this time the oil pressure comes from the excavator, the loader boom, and the forearm. Bucket, swing or slide operation, so the big and small arms will be damaged, and the breaker bolts may be broken, the brackets may be damaged, the steel drills may be broken or scratched, and the breaker should be avoided to remove stones. In particular, it is pointed out that the steel brazing is inserted in the stones, and you must not walk when excavating.

4) Do not use the steel drill as a pry bar

Bolts and drills may break if the drill is used as a pry bar when crushing stones

5) Do not keep hitting for more than one minute

When hitting hard rocks, the same hit should not last more than a minute, and then switch to another hit.

Long-term beating operation will cause the oil temperature to rise, which will lead to damage to the brazing bushing and wear of the brazing progress.

6) For long and hard large stones, it can start to break at the cracks or ends, so that it is relatively easy to break the stones.

7) The breaker should be operated at the routine engine speed

When the breaker is broken, the engine speed should meet the specified fixed value. Exceeding the engine speed required for the operation will not increase the striking force, but it will cause the oil temperature to rise and cause equipment damage.

8) The breaker cannot work in water and mud

Do not use the breaker in water or mud, otherwise the piston or similar parts may rust and cause permanent damage. Submerged breakers should be specially ordered if working in or under water is required.

9) Do not let the breaker fall directly to break the stones

If the breaker falls directly to the gravel, the breaker or excavator will bear excessive force, which will easily damage the parts of the excavator and loader.

10) When the stroke of the cylinder rod on the excavator boom is the largest, please do not strike

When the excavator and loader oil cylinder rod has the maximum stroke (the cylinder rod is fully extended or retracted), crushing rocks will damage the oil cylinder and various parts of the excavator and loader.

project
unit
HL185
total length
mm
3253
working weight
kg
4590
ib
10115
work pressure
kgf/cm2
180-220
psi
2559-3182
oil quantity
l/min
220-260
gpm
58.1-68.6
Strike frequency
bpm
210-300
Drill rod diameter
mm
185
inch
7.27
Drill rod length
mm
1500
inch
70.76
Drill rod weight
kg
320
Tubing size
mm
32
inch
PF1-1/4"
Suitable for excavators
ton
36-45
m3
1.4-2.0
Specifiion
item
value
Marketing Type
Hot Product 2022
Place of Origin
China
province
Guangdong
brand
HL
Warranty
1 Year
new or old
New
use
construction work
weight
4586kg
Suitable Excavator(ton)
36-45ton
Core Components
mainbody
Brand
HL
Payment
Ali Trade Assurance; T/T;;Western Union;D/P;D/A;T/T
Delivery
5-15 Days
Process
forging
Local Service Loion:
None
Warranty of core components
1 years
After Warranty Service
Video technical support, Online support
After-sales Service Provided
Video technical support, Online support
Guangzhou Hengli Construction Machinery was established in 2011 as a diversified professional machinery parts company integrating innovation, sales and service. With a high-quality professional technical team, a complete sales and service network, an independent innovation of high-strength, high wear-resistant, high-performance materials and an unique precision forging process, our product quality is at the leading level in the industry. And according to international standards, we have established a set of modern quality management system. Our products are suitable for large coal mines, iron ore mines, copper mines, oil sands mines and other industrial mines. We have become a long-term partner of many OEM machines in the world. Our products sell well all over the world, and their performance is well received and recognized by our customers. We have a physical store as well as a marketing and after-sales operation center in the central area of Guangzhou, Guangdong Province, with 500 and 800 square meters respectively. Our main products include: forged bucket teeth, forged bucket adapters, bucket tooth pins, DDR brand high wear-resistant bucket pins, bucket bushings, screws, gaskets, etc. We are specialized in selling chassis parts, engine parts, hydraulic parts, gear parts, vulnerable parts, hammer parts, hydraulic cylinders, filter series and other construction machinery parts. We warmly welcome domestic and foreign customers to cooperate and create a better future together.

Warehouse & Inventory

We maintain large ready stock of full series excavator undercarriage spare parts, including track rollers, top rollers, idlers, sprockets, track chains and track shoes. All goods are well classified and stored in dry warehouse to avoid rust and damage.

Most standard models can be shipped out within 1–3 working days once payment confirmed. We support mixed container orders with different excavator brands and models. For large bulk orders or customized requirements, please contact our sales team to check real-time stock and lead time before placing the order.

Strict pre-shipment inspection will be carried out for every batch to guarantee the quality matches your requirements.

Excavator parts warehouse stock

Shipping & Packing

Shipping Options:

1. Express: DHL / FedEx / TNT for small samples, delivery in 3–7 working days.
2. Air freight: Suitable for medium urgent orders, transit time 7–12 working days.
3. Sea freight: LCL or FCL for large bulk orders, transit time 20–40 days depending on destination port.

Packing Standard:

Standard export plywood wooden cases or strong cartons, fixed and wrapped tightly to prevent collision and rust during long-distance transportation. Wooden packing meets international fumigation requirements.

Freight cost is calculated separately based on total weight, volume and delivery address. We can provide EXW, FOB, CIF and DDP trade terms as your request.

Export packing for excavator spare parts