Home › Excavator Hydraulic Breaker › HL85 8 Ton Excavator Rock Breaker Jack Hydraulic Hammer

HL85 8 Ton Excavator Rock Breaker Jack Hydraulic Hammer

 
Place of Origin: Guangdong, China
Brand Name: HL
Model Number: HL85
Price Negotiable
Order (MOQ) 1 pcs
Payment L/C, D/A, D/P, T/T, Western Union
Product Origin China

LEAVE A MESSAGE

If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.

Subject : HL85 8 Ton Excavator Rock Breaker Jack Hydraulic Hammer
  • DETAILS
  • WAREHOUSE
  • SHIPPING
Marketing Type: Hot Product 2022 Warranty: 1 Year
Condition: New Applicable Industries: Construction Work
Weight: 550 Kg Suitable Excavator(ton): 8-15ton
Core Components: Mainbody Brand: HL
Payment: T/T;;Western Union;D/P;D/A;T/T Delivery: 5-15 Days
Process: Forging Local Service Loion:: None
Warranty Of Core Components: 1 Years After Warranty Service: Video Technical Support, Online Support
After-sales Service Provided: Video Technical Support, Online Support Port: Guangzhou Shenzhen Xiamen
Highlight:

8 Ton Excavator Rock Breaker

,

Hydraulic Excavator Rock Breaker

HL85 High Quality Excavator Breaker Rock Breaker Jack Hydraulic Hammer

Operation guide of hydraulic breaker:

Precautions

1. A debris shield device should be installed in front of the cab to prevent damage caused by flying debris during operation.

2. During the operation, all on-site personnel including excavator drivers must wear earplugs and masks.

3. The driver should sit on the seat to operate the breaker, and only when the excavator/loader and the breaker are in normal state can the breaker be broken.

4. If someone enters the dangerous area of ​​operation, the operation of the breaker should be stopped immediately; because compared with the excavation operation, the personnel are easily hit by the flying fragments during the operation of the breaker.

5. When operating with a breaker, the operation of the excavator/loader should comply with the safety operation regulations of the excavator/loader manufacturer. Make sure to use a well-installed and properly debugged breaker.

6. Do not operate the breaker when you are drunk or have a reaction to taking medicine.

When disengaging the curved back for maintenance and overhaul, ensure that the working conditions are stable and lower the working device.

the right way to work

1. Proper breakdown force

For effective breaking, the breaker should apply a suitable breakdown force. If the breakdown force is insufficient, the hammering energy of the piston will not be able to effectively break the stone; thus the reaction force of the hammering force will be transmitted to the breaker body, the boom of the excavator/loader, etc., thereby damaging these parts.

On the other hand, when the excavator/loader boom is lifted, if the breakdown force is too large and the crushing operation is performed, the machine may suddenly tilt at the moment of the crushed stone, and the crushing hammer is violent, and the crushing hammer violently hits the stone, which will cause crushing The hammer is damaged. In this condition, the striking operation will be carried out, and the vibration will also be transmitted to the crawler and wheels of the excavator. Operation in this condition should be avoided.

Therefore, during the striking operation, always pay attention to the breakdown force of the breaker, and do not work when the breakdown force is not appropriate.

2. Breakdown direction

The breakdown direction should be in line with the steel brazing. When the steel drill breaks the rock, it should be kept in the vertical direction. If the hammering direction is inclined, the steel drill may slip off during the hammering operation, causing the steel drill and the piston to break or get stuck. Therefore, during the crushing operation, the breakdown point should be selected, so that the hammering can be guaranteed to be stable during the hammering operation of the steel drill.

project
unit
HL85
total length
mm
1767
working weight
kg
550
ib
1125
work pressure
kgf/cm2
130-160
psi
1706-2133
oil quantity
l/min
60-100
9pm
15.8-26.4
Strike frequency
bpm
400-800
Drill rod diameter
mm
85
inch
3.34
Drill rod length
mm
850
inch
33.41
Drill rod weight
kg
32
Tubing size
mm
19
inch
PF3-4''
Suitable for excavators
ton
8-15
m3
0.3-0.5
Specifiion
item
value
Marketing Type
Hot Product 2022
Place of Origin
China
province
Guangdong
brand
HL
Warranty
1 Year
new or old
New
use
construction work
weight
550kg
Suitable Excavator(ton)
12~30 ton
Core Components
mainbody
Brand
HL
Payment
T/T;;Western Union;D/P;D/A;T/T
Delivery
5-15 Days
Process
forging
Local Service Loion:
None
Warranty of core components
1 years
After Warranty Service
Video technical support, Online support
After-sales Service Provided
Video technical support, Online support
Guangzhou Hengli Construction Machinery was established in 2011 as a diversified professional machinery parts company integrating innovation, sales and service. With a high-quality professional technical team, a complete sales and service network, an independent innovation of high-strength, high wear-resistant, high-performance materials and an unique precision forging process, our product quality is at the leading level in the industry. And according to international standards, we have established a set of modern quality management system. Our products are suitable for large coal mines, iron ore mines, copper mines, oil sands mines and other industrial mines. We have become a long-term partner of many OEM machines in the world. Our products sell well all over the world, and their performance is well received and recognized by our customers. We have a physical store as well as a marketing and after-sales operation center in the central area of Guangzhou, Guangdong Province, with 500 and 800 square meters respectively. Our main products include: forged bucket teeth, forged bucket adapters, bucket tooth pins, DDR brand high wear-resistant bucket pins, bucket bushings, screws, gaskets, etc. We are specialized in selling chassis parts, engine parts, hydraulic parts, gear parts, vulnerable parts, hammer parts, hydraulic cylinders, filter series and other construction machinery parts. We warmly welcome domestic and foreign customers to cooperate and create a better future together.

Warehouse & Inventory

We maintain large ready stock of full series excavator undercarriage spare parts, including track rollers, top rollers, idlers, sprockets, track chains and track shoes. All goods are well classified and stored in dry warehouse to avoid rust and damage.

Most standard models can be shipped out within 1–3 working days once payment confirmed. We support mixed container orders with different excavator brands and models. For large bulk orders or customized requirements, please contact our sales team to check real-time stock and lead time before placing the order.

Strict pre-shipment inspection will be carried out for every batch to guarantee the quality matches your requirements.

Excavator parts warehouse stock

Shipping & Packing

Shipping Options:

1. Express: DHL / FedEx / TNT for small samples, delivery in 3–7 working days.
2. Air freight: Suitable for medium urgent orders, transit time 7–12 working days.
3. Sea freight: LCL or FCL for large bulk orders, transit time 20–40 days depending on destination port.

Packing Standard:

Standard export plywood wooden cases or strong cartons, fixed and wrapped tightly to prevent collision and rust during long-distance transportation. Wooden packing meets international fumigation requirements.

Freight cost is calculated separately based on total weight, volume and delivery address. We can provide EXW, FOB, CIF and DDP trade terms as your request.

Export packing for excavator spare parts